Skip Ribbon Commands
Skip to main content
Item is currently unrated. Press SHIFT+ENTER to rate this item.1 star selected. Press SHIFT+ENTER to submit. Press TAB to increase rating. Press SHIFT+ESCAPE to leave rating submit mode.2 stars selected. Press SHIFT+ENTER to submit. Press TAB to increase rating. Press SHIFT+TAB to decrease rating. Press SHIFT+ESCAPE to leave rating submit mode.3 stars selected. Press SHIFT+ENTER to submit. Press TAB to increase rating. Press SHIFT+TAB to decrease rating. Press SHIFT+ESCAPE to leave rating submit mode.4 stars selected. Press SHIFT+ENTER to submit. Press TAB to increase rating. Press SHIFT+TAB to decrease rating. Press SHIFT+ESCAPE to leave rating submit mode.5 stars selected. Press SHIFT+ENTER to submit. Press SHIFT+TAB to decrease rating. Press SHIFT+ESCAPE to leave rating submit mode.
Construction of Road and Utilities Land Block C2, C3
Project No    
   
Category Construction
   
Project Description
The Work of this Contract is for the construction of roads and utilities works at RC LIPE area. The contractor shall provide all supervision labor, materials and equipment necessary for the procurement, construction and complete the work in accordance with contract documents. The works shall include Rough grading, roads and utilities in Industrial area C2, C3 land blocks, Overall grading and storm drainage system for the entire C2 – C3 land blocks , Primary, Secondary and Tertiary Roads, Storm Water Drainage System, Utilities included are Potable water, Irrigation water, Industrial waste Sanitary Sewer, Power Distribution, Street Lighting and Telecom.
   
Project Execution 2013