Skip Ribbon Commands
Skip to main content
Item is currently unrated. Press SHIFT+ENTER to rate this item.1 star selected. Press SHIFT+ENTER to submit. Press TAB to increase rating. Press SHIFT+ESCAPE to leave rating submit mode.2 stars selected. Press SHIFT+ENTER to submit. Press TAB to increase rating. Press SHIFT+TAB to decrease rating. Press SHIFT+ESCAPE to leave rating submit mode.3 stars selected. Press SHIFT+ENTER to submit. Press TAB to increase rating. Press SHIFT+TAB to decrease rating. Press SHIFT+ESCAPE to leave rating submit mode.4 stars selected. Press SHIFT+ENTER to submit. Press TAB to increase rating. Press SHIFT+TAB to decrease rating. Press SHIFT+ESCAPE to leave rating submit mode.5 stars selected. Press SHIFT+ENTER to submit. Press SHIFT+TAB to decrease rating. Press SHIFT+ESCAPE to leave rating submit mode.
Labour Housing Phase 2
Project No    
   
Category Construction
   
Project Description
The Contractor’s summary of scope of work to be performed under this task shall include, but not limited to the following:Perform detailed architectural and engineering design for the Labor Housing Phase -2 next to the Royal Commission (RC) Nursery in Haii Al-Sawari at Madinat Yanbu Al-Sinaiyah (MYAS).Phase -2 includes only Camp C. This camp includes the following major buildings program components; multiple –three floor housing buildings, a single-story building (s) which accommodates a super market, laundry, barber shop, warehouse and administration a two-floor building which accommodates the kitchen, dining and a mosque. The mosque will be site adapted from RC-Prototypical design documents.This camp also includes the following ancillary site components, recreation field – (No Building), landscaping, access roads and parking lot. This camp component shall be designed to be developed, constructed and operated independent of the other camps.
   
Project Execution 2013